Nathan Lambert

@natolambert

With the data center slowdown coming after the election, I find this post increasingly likely. There’s way more incentive in a path that seems eminently doable. I consider this in line with the acceleration in AECI from the recent METR report. Coding agents and inference compute
打开原帖#511482
  1. Industry

    Elon Musk: @TheFlintFace @IterIntellectus 100GW in space is roughly equal to 800GW on Earth. Moreover, solar on Earth must be paired with massive batteries to continue powering co…
  2. Industry

    Runway: Seedance 2.5 in 4K is here
  3. Industry

    Perplexity: We are publishing new research on our findings from red-teaming SPACE…